Magic City 230kV sub (J880)

Magic City 230kV sub is a 150.0 MW wind interconnection project in Ward County, North Dakota with a current status of withdrawn. It is proposed to connect at Magic City 230kV sub.

150.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameMagic City 230kV sub
Queue IDJ880
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity150.0 MW
StateNorth Dakota
CountyWard County
Point of interconnectionMagic City 230kV sub
Requested (queue) date2017-06-16
Proposed in-service date2020-09-15
Operational date2020-09-15
Withdrawn date2019-10-24
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.