Magruder BESS (0744)

Magruder BESS is a 20.0 MW battery interconnection project in Ulster, New York with a current status of withdrawn. It is proposed to connect at East Walden - Modena 115kV.

20.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameMagruder BESS
Queue ID0744
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity20.0 MW
StateNew York
CountyUlster
Point of interconnectionEast Walden - Modena 115kV
Requested (queue) date2018-07-18
Proposed in-service date2026-01-31
Operational date
Withdrawn date
DeveloperMitchell Energy Facility, LLC
Utility / transmission ownerCHG&E

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata