Main Canal Headworks (56698_1)

Main Canal Headworks is a 26.8 MW other interconnection project in Grant, Washington with a current status of operational.

26.8 MWCapacity
OperationalStatus
AVAMarket
OtherTechnology

Project facts

Canonical nameMain Canal Headworks
Queue ID56698_1
Statusoperational
Source status(OP) Operating
MarketAVA
TechnologyOther
Capacity26.8 MW
StateWashington
CountyGrant
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1987-01-01
Withdrawn date—
Developer—
Utility / transmission ownerColumbia Basin Hydropower

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata