Majestic- Lemoyne 345 kV (S1067)

Majestic- Lemoyne 345 kV is a 75.0 MW generation interconnection project in Washtenaw, Michigan with a current status of operational. It is proposed to connect at Majestic- Lemoyne 345 kV.

75.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameMajestic- Lemoyne 345 kV
Queue IDS1067
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity75.0 MW
StateMichigan
CountyWashtenaw
Point of interconnectionMajestic- Lemoyne 345 kV
Requested (queue) date2024-10-02
Proposed in-service date2027-09-30
Operational date2027-09-30
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata