Majestic - Milan 345kV Line (J1237)

Majestic - Milan 345kV Line is a 175.0 MW solar interconnection project in Washtenaw County, Michigan with a current status of withdrawn. It is proposed to connect at Majestic - Milan 345kV Line.

175.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMajestic - Milan 345kV Line
Queue IDJ1237
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity175.0 MW
StateMichigan
CountyWashtenaw County
Point of interconnectionMajestic - Milan 345kV Line
Requested (queue) date2019-04-29
Proposed in-service date2022-09-01
Operational date2022-09-01
Withdrawn date2020-01-03
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata