Malta Bend - Norton 161 kV Line (GEN-2024-375)

Malta Bend - Norton 161 kV Line is a 100.0 MW battery interconnection project in Saline, Missouri with a current status of withdrawn. It is proposed to connect at Malta Bend - Norton 161 kV Line.

100.0 MWCapacity
WithdrawnStatus
MOMarket
BatteryTechnology

Project facts

Canonical nameMalta Bend - Norton 161 kV Line
Queue IDGEN-2024-375
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyBattery
Capacity100.0 MW
StateMissouri
CountySaline
Point of interconnectionMalta Bend - Norton 161 kV Line
Requested (queue) date2025-03-01
Proposed in-service date2029-03-01
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata