Marble River II Wind Farm (0171)

Marble River II Wind Farm is a 132.2 MW wind interconnection project in Clinton, New York with a current status of operational. It is proposed to connect at Willis-Plattsburgh WP-2 230kV.

132.2 MWCapacity
OperationalStatus
DMarket
WindTechnology

Project facts

Canonical nameMarble River II Wind Farm
Queue ID0171
Statusoperational
Source status14
MarketD
TechnologyWind
Capacity132.2 MW
StateNew York
CountyClinton
Point of interconnectionWillis-Plattsburgh WP-2 230kV
Requested (queue) date2005-02-08
Proposed in-service date
Operational date
Withdrawn date
DeveloperMarble River, LLC
Utility / transmission ownerNYPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata