Maricopa Solar (69684_70125)

Maricopa Solar is a 550.0 MW battery interconnection project in Maricopa, Arizona with a current status of active.

550.0 MWCapacity
ActiveStatus
AZPSMarket
BatteryTechnology

Project facts

Canonical nameMaricopa Solar
Queue ID69684_70125
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketAZPS
TechnologyBattery
Capacity550.0 MW
StateArizona
CountyMaricopa
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-09-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerMaricopa Solar

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata