Maryville 161kV (ASGI-2018-001)
Maryville 161kV is a 230.0 MW wind interconnection project in Nodaway, Missouri with a current status of operational. It is proposed to connect at Maryville 161kV.
230.0 MWCapacity
OperationalStatus
MOMarket
WindTechnology
Project facts
| Canonical name | Maryville 161kV |
|---|---|
| Queue ID | ASGI-2018-001 |
| Status | operational |
| Source status | IA FULLY EXECUTED/COMMERCIAL OPERATION |
| Market | MO |
| Technology | Wind |
| Capacity | 230.0 MW |
| State | Missouri |
| County | Nodaway |
| Point of interconnection | Maryville 161kV |
| Requested (queue) date | 2018-01-22 |
| Proposed in-service date | — |
| Operational date | 2019-12-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AECI |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata