Masked (020392)

Masked is a 474.0 MW gas interconnection project in Cherokee, South Carolina with a current status of withdrawn. It is proposed to connect at Riverview.

474.0 MWCapacity
WithdrawnStatus
SCMarket
GasTechnology

Project facts

Canonical nameMasked
Queue ID020392
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologyGas
Capacity474.0 MW
StateSouth Carolina
CountyCherokee
Point of interconnectionRiverview
Requested (queue) date2018-04-12
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata