Masked (021369)

Masked is a 80.0 MW solar interconnection project in Fairfield, South Carolina with a current status of withdrawn. It is proposed to connect at N/A.

80.0 MWCapacity
WithdrawnStatus
SCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID021369
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar
Capacity80.0 MW
StateSouth Carolina
CountyFairfield
Point of interconnectionN/A
Requested (queue) date2018-04-20
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata