Masked (042100)

Masked is a 110.0 MW solar interconnection project in Newberry, South Carolina with a current status of withdrawn. It is proposed to connect at Champion 100 kV B/W.

110.0 MWCapacity
WithdrawnStatus
SCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID042100
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar
Capacity110.0 MW
StateSouth Carolina
CountyNewberry
Point of interconnectionChampion 100 kV B/W
Requested (queue) date2019-08-09
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata