Masked (175826)

Masked is a 150.0 MW battery interconnection project in Greenville, South Carolina with a current status of withdrawn. It is proposed to connect at N Greenville Tie.

150.0 MWCapacity
WithdrawnStatus
SCMarket
BatteryTechnology

Project facts

Canonical nameMasked
Queue ID175826
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologyBattery
Capacity150.0 MW
StateSouth Carolina
CountyGreenville
Point of interconnectionN Greenville Tie
Requested (queue) date2021-05-21
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.