Masked (977273)

Masked is a 63.0 MW solar interconnection project in Union, South Carolina with a current status of withdrawn. It is proposed to connect at Jordan (Gillespie Tap) 100 kV.

63.0 MWCapacity
WithdrawnStatus
SCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID977273
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar
Capacity63.0 MW
StateSouth Carolina
CountyUnion
Point of interconnectionJordan (Gillespie Tap) 100 kV
Requested (queue) date2025-06-20
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.