Masked is a 60.0 MW solar interconnection project in Chester, South Carolina with a current status of withdrawn. It is proposed to connect at Parr Wh 100 kV.

60.0 MWCapacity
WithdrawnStatus
SCMarket
SolarTechnology

Project facts

Canonical nameMasked
Queue ID983628
Statuswithdrawn
Source statusWithdrawn
MarketSC
TechnologySolar
Capacity60.0 MW
StateSouth Carolina
CountyChester
Point of interconnectionParr Wh 100 kV
Requested (queue) date2025-09-29
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-24poi_namePARR WH 100 kVParr Wh 100 kVlow
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: duke-dec-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata