Masury-Maysvile 69kV (AB1-114)

Masury-Maysvile 69kV is a 12.5 MW battery interconnection project in Mercer, Pennsylvania with a current status of withdrawn.

12.5 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameMasury-Maysvile 69kV
Queue IDAB1-114
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity12.5 MW
StatePennsylvania
CountyMercer
Point of interconnection
Requested (queue) date2015-10-28
Proposed in-service date2017-01-27
Operational date
Withdrawn date2017-03-02
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.