Maud 138 kV substation (GEN-2022-237)

Maud 138 kV substation is a 150.0 MW solar interconnection project in Pottawatomie, Oklahoma with a current status of withdrawn. It is proposed to connect at Maud 138 kV substation.

150.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameMaud 138 kV substation
Queue IDGEN-2022-237
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity150.0 MW
StateOklahoma
CountyPottawatomie
Point of interconnectionMaud 138 kV substation
Requested (queue) date2023-02-28
Proposed in-service date2028-09-15
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata