Maywood - Zachary 345 kV line (J2142)

Maywood - Zachary 345 kV line is a 150.0 MW solar interconnection project in Adair, Missouri with a current status of operational. It is proposed to connect at Maywood - Zachary 345 kV line.

150.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameMaywood - Zachary 345 kV line
Queue IDJ2142
Statusoperational
Source statusPending Transfer
Market
TechnologySolar
Capacity150.0 MW
StateMissouri
CountyAdair
Point of interconnectionMaywood - Zachary 345 kV line
Requested (queue) date2021-11-03
Proposed in-service date2024-08-01
Operational date2024-08-01
Withdrawn date
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.