McDowell 138 kV (AE2-277)

McDowell 138 kV is a 38.2 MW solar interconnection project in Mercer, Pennsylvania with a current status of withdrawn.

38.2 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMcDowell 138 kV
Queue IDAE2-277
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity38.2 MW
StatePennsylvania
CountyMercer
Point of interconnection
Requested (queue) date2019-03-28
Proposed in-service date
Operational date
Withdrawn date2022-03-30
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.