McDowell - Campbell 69 kV (AI1-053)

McDowell - Campbell 69 kV is a 6.6 MW solar interconnection project in Mercer, Pennsylvania with a current status of withdrawn.

6.6 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMcDowell - Campbell 69 kV
Queue IDAI1-053
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity6.6 MW
StatePennsylvania
CountyMercer
Point of interconnection—
Requested (queue) date2022-06-10
Proposed in-service date2022-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata