MDU / NVSS-II (66983_822)
MDU / NVSS-II is a 13.5 MW solar interconnection project in Nye, Nevada with a current status of operational.
13.5 MWCapacity
OperationalStatus
NEVPMarket
SolarTechnology
Project facts
| Canonical name | MDU / NVSS-II |
|---|---|
| Queue ID | 66983_822 |
| Status | operational |
| Source status | (OP) Operating |
| Market | NEVP |
| Technology | Solar |
| Capacity | 13.5 MW |
| State | Nevada |
| County | Nye |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2017-02-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Greenbacker Renewable Energy Corporation |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata