MDU / NVSS-II (66983_822)

MDU / NVSS-II is a 13.5 MW solar interconnection project in Nye, Nevada with a current status of operational.

13.5 MWCapacity
OperationalStatus
NEVPMarket
SolarTechnology

Project facts

Canonical nameMDU / NVSS-II
Queue ID66983_822
Statusoperational
Source status(OP) Operating
MarketNEVP
TechnologySolar
Capacity13.5 MW
StateNevada
CountyNye
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2017-02-01
Withdrawn date
Developer
Utility / transmission ownerGreenbacker Renewable Energy Corporation

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata