ME-EDFR-Phase I-Woolwich (67349_WLWCH)

ME-EDFR-Phase I-Woolwich is a 5.0 MW solar interconnection project in Sagadahoc, Maine with a current status of operational.

5.0 MWCapacity
OperationalStatus
ISNEMarket
SolarTechnology

Project facts

Canonical nameME-EDFR-Phase I-Woolwich
Queue ID67349_WLWCH
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologySolar
Capacity5.0 MW
StateMaine
CountySagadahoc
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-09-01
Withdrawn date
Developer
Utility / transmission ownerGreen Mile Solar, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata