Me195SB (Q25-LG-6-6)

Me195SB is a 195.0 MW solar+battery interconnection project in Luna, New Mexico with a current status of active. It is proposed to connect at Luna-Diablo 345 kV line.

195.0 MWCapacity
ActiveStatus
WestMarket
Solar+BatteryTechnology

Project facts

Canonical nameMe195SB
Queue IDQ25-LG-6-6
Statusactive
Source statusactive
MarketWest
TechnologySolar+Battery
Capacity195.0 MW
StateNew Mexico
CountyLuna
Point of interconnectionLuna-Diablo 345 kV line
Requested (queue) date2025-06-06
Proposed in-service date2029-03-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.