Medway Hydro - CNR only is a 4.0 MW other interconnection project in Penobscot, Maine with a current status of operational. It is proposed to connect at Medway Substation.

4.0 MWCapacity
OperationalStatus
BHEMarket
OtherTechnology

Project facts

Canonical nameMedway Hydro - CNR only
Queue ID612
Statusoperational
Source statusC
MarketBHE
TechnologyOther
Capacity4.0 MW
StateMaine
CountyPenobscot
Point of interconnectionMedway Substation
Requested (queue) date2016-04-26
Proposed in-service date
Operational date2017-08-14
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.