Melrose 69 kV Substation (GEN-2022-184)

Melrose 69 kV Substation is a 59.4 MW solar interconnection project in Curry, New Mexico with a current status of withdrawn. It is proposed to connect at Melrose 69 kV Substation.

59.4 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameMelrose 69 kV Substation
Queue IDGEN-2022-184
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity59.4 MW
StateNew Mexico
CountyCurry
Point of interconnectionMelrose 69 kV Substation
Requested (queue) date2023-03-02
Proposed in-service date2024-12-10
Operational date
Withdrawn date2023-10-02
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata