Meramec Plant – 138KV Switchyard (R1059)

Meramec Plant – 138KV Switchyard is a 98.8 MW generation interconnection project with a current status of operational. It is proposed to connect at Meramec Plant – 138KV Switchyard.

98.8 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameMeramec Plant – 138KV Switchyard
Queue IDR1059
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity98.8 MW
State
CountySt. Louis
Point of interconnectionMeramec Plant – 138KV Switchyard
Requested (queue) date2024-12-16
Proposed in-service date2025-12-31
Operational date2025-12-31
Withdrawn date
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.