Merricourt Wind 230kV (S1014)

Merricourt Wind 230kV is a 9.0 MW generation interconnection project with a current status of operational. It is proposed to connect at Merricourt Wind 230kV.

9.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameMerricourt Wind 230kV
Queue IDS1014
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity9.0 MW
StateNorth Dakota
County
Point of interconnectionMerricourt Wind 230kV
Requested (queue) date2022-03-09
Proposed in-service date2025-10-31
Operational date2025-10-31
Withdrawn date
Developer
Utility / transmission ownerMONTANA-DAKOTA UTILITIES CO.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata