MESQUITE SOLAR 1 (FKA MESQUITE GENERATION) (643T)

MESQUITE SOLAR 1 (FKA MESQUITE GENERATION) is a 165.0 MW solar interconnection project in Maricopa, Arizona with a current status of operational. It is proposed to connect at Hassayampa Common Bus 500 kV.

165.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameMESQUITE SOLAR 1 (FKA MESQUITE GENERATION)
Queue ID643T
Statusoperational
Source statusCOMPLETED
Market
TechnologySolar
Capacity165.0 MW
StateArizona
CountyMaricopa
Point of interconnectionHassayampa Common Bus 500 kV
Requested (queue) date2010-07-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata