Metomen 138 kV (J1994)
Metomen 138 kV is a 97.1 MW solar interconnection project in Fond Du Lac, Wisconsin with a current status of withdrawn. It is proposed to connect at Metomen 138 kV.
97.1 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | Metomen 138 kV |
|---|---|
| Queue ID | J1994 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 97.1 MW |
| State | Wisconsin |
| County | Fond Du Lac |
| Point of interconnection | Metomen 138 kV |
| Requested (queue) date | 2021-07-30 |
| Proposed in-service date | 2025-12-31 |
| Operational date | 2025-12-31 |
| Withdrawn date | 2024-10-01 |
| Developer | — |
| Utility / transmission owner | AMERICAN TRANSMISSION COMPANY |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata