Middleton Airport Solar (62731_1)

Middleton Airport Solar is a 5.6 MW solar interconnection project in Dane, Wisconsin with a current status of operational.

5.6 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameMiddleton Airport Solar
Queue ID62731_1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity5.6 MW
StateWisconsin
CountyDane
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-07-01
Withdrawn date
Developer
Utility / transmission ownerMadison Gas & Electric Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata