Middletown Energy Storage is a 50.0 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at Shoemaker 69 kV .

50.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameMiddletown Energy Storage
Queue ID1259
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity50.0 MW
StateNew York
CountyOrange
Point of interconnectionShoemaker 69 kV
Requested (queue) date2021-09-22
Proposed in-service date2021-11-30
Operational date
Withdrawn date
DeveloperOriden LLC
Utility / transmission ownerO&R

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.