Midfield 22.9 kV (AF1-150)

Midfield 22.9 kV is a 14.4 MW gas interconnection project in Allegheny, Pennsylvania with a current status of operational.

14.4 MWCapacity
OperationalStatus
—Market
GasTechnology

Project facts

Canonical nameMidfield 22.9 kV
Queue IDAF1-150
Statusoperational
Source statusIn Service
Market—
TechnologyGas
Capacity14.4 MW
StatePennsylvania
CountyAllegheny
Point of interconnection—
Requested (queue) date2019-09-19
Proposed in-service date—
Operational date2021-09-01
Withdrawn date—
Developer—
Utility / transmission ownerDL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata