Midian 138 kV Substation (GEN-2024-330)

Midian 138 kV Substation is a 225.0 MW battery interconnection project in Butler, Kansas with a current status of operational. It is proposed to connect at Midian 138 kV Substation.

225.0 MWCapacity
OperationalStatus
KSMarket
BatteryTechnology

Project facts

Canonical nameMidian 138 kV Substation
Queue IDGEN-2024-330
Statusoperational
Source statusDISIS STAGE
MarketKS
TechnologyBattery
Capacity225.0 MW
StateKansas
CountyButler
Point of interconnectionMidian 138 kV Substation
Requested (queue) date2025-03-01
Proposed in-service date
Operational date2027-07-01
Withdrawn date
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.