Midian 138kV Substation (GEN-2016-024)

Midian 138kV Substation is a 55.9 MW solar interconnection project in El Dorado, Kansas with a current status of withdrawn. It is proposed to connect at Midian 138kV Substation.

55.9 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameMidian 138kV Substation
Queue IDGEN-2016-024
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity55.9 MW
StateKansas
CountyEl Dorado
Point of interconnectionMidian 138kV Substation
Requested (queue) date2016-03-29
Proposed in-service date
Operational date
Withdrawn date2019-05-24
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.