Midland 138 kV (AG1-292)

Midland 138 kV is a 36.6 MW other interconnection project in Beaver, Pennsylvania with a current status of withdrawn.

36.6 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameMidland 138 kV
Queue IDAG1-292
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity36.6 MW
StatePennsylvania
CountyBeaver
Point of interconnection
Requested (queue) date2020-09-28
Proposed in-service date2023-12-31
Operational date
Withdrawn date2021-03-28
Developer
Utility / transmission ownerDL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata