Midland 23 kV I (AE2-114)

Midland 23 kV I is a 17.1 MW solar interconnection project in Beaver, Pennsylvania with a current status of operational.

17.1 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameMidland 23 kV I
Queue IDAE2-114
Statusoperational
Source statusIn Service
Market
TechnologySolar
Capacity17.1 MW
StatePennsylvania
CountyBeaver
Point of interconnection
Requested (queue) date2019-03-01
Proposed in-service date
Operational date2023-12-31
Withdrawn date
Developer
Utility / transmission ownerDL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.