Mineral Basin Solar Power (67378_MB)

Mineral Basin Solar Power is a 401.6 MW solar interconnection project in Clearfield, Pennsylvania with a current status of active.

401.6 MWCapacity
ActiveStatus
NYISMarket
SolarTechnology

Project facts

Canonical nameMineral Basin Solar Power
Queue ID67378_MB
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketNYIS
TechnologySolar
Capacity401.6 MW
StatePennsylvania
CountyClearfield
Point of interconnection
Requested (queue) date
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMineral Basin Solar Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata