Minerva BESS II (1143)

Minerva BESS II is a 600.0 MW battery interconnection project in Manhattan, New York with a current status of withdrawn. It is proposed to connect at W 49th st 345kV.

600.0 MWCapacity
WithdrawnStatus
JMarket
BatteryTechnology

Project facts

Canonical nameMinerva BESS II
Queue ID1143
Statuswithdrawn
Source status0
MarketJ
TechnologyBattery
Capacity600.0 MW
StateNew York
CountyManhattan
Point of interconnectionW 49th st 345kV
Requested (queue) date2021-02-16
Proposed in-service date2021-06-30
Operational date
Withdrawn date
DeveloperMinerva Power Connection LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.