Mingo 115kV is a 108.0 MW wind interconnection project in Thomas County, Kansas with a current status of withdrawn. It is proposed to connect at Mingo 115kV.

108.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameMingo 115kV
Queue IDGEN-2006-040
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity108.0 MW
StateKansas
CountyThomas County
Point of interconnectionMingo 115kV
Requested (queue) date2006-11-07
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.