Mint Farm Load Increase (L0439)

Mint Farm Load Increase is a 21.0 MW other interconnection project in Cowlitz, Washington with a current status of withdrawn. It is proposed to connect at Cowlitz PUD's Mint Farm Substation.

21.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameMint Farm Load Increase
Queue IDL0439
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity21.0 MW
StateWashington
CountyCowlitz
Point of interconnectionCowlitz PUD's Mint Farm Substation
Requested (queue) date2018-03-07
Proposed in-service date2021-03-07
Operational date
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata