MISO Queue Project E0004 — Battery in Saginaw, Michigan
MISO Queue Project E0004 — Battery in Saginaw, Michigan is a 104.3 MW battery interconnection project in Saginaw, Michigan with a current status of active. It is proposed to connect at Bullock-Signaw River 138kV.
104.3 MWCapacity
ActiveStatus
MISOMarket
BatteryTechnology
Project facts
| Canonical name | MISO Queue Project E0004 — Battery in Saginaw, Michigan |
|---|---|
| Queue ID | E0004 |
| Status | active |
| Source status | active |
| Market | MISO |
| Technology | Battery |
| Capacity | 104.3 MW |
| State | Michigan |
| County | Saginaw |
| Point of interconnection | Bullock-Signaw River 138kV |
| Requested (queue) date | 2025-08-07 |
| Proposed in-service date | 2027-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Hackett Energy Storage LLC |
| Utility / transmission owner | Consumers Energy Co - (MI) |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata