MISO Queue Project E0015 — Wind in Franklin, Iowa

MISO Queue Project E0015 — Wind in Franklin, Iowa is a 360.0 MW wind interconnection project in Franklin, Iowa with a current status of active. It is proposed to connect at Quinn-Blackhawk 345kV.

360.0 MWCapacity
ActiveStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project E0015 — Wind in Franklin, Iowa
Queue IDE0015
Statusactive
Source statusactive
MarketMISO
TechnologyWind
Capacity360.0 MW
StateIowa
CountyFranklin
Point of interconnectionQuinn-Blackhawk 345kV
Requested (queue) date2025-08-06
Proposed in-service date2028-02-06
Operational date
Withdrawn date
DeveloperInterstate Power and Light Co
Utility / transmission ownerInterstate Power and Light Co

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata