MISO Queue Project E0016 — Gas in Calumet, Wisconsin

MISO Queue Project E0016 — Gas in Calumet, Wisconsin is a 1,211.2 MW gas interconnection project in Calumet, Wisconsin with a current status of active. It is proposed to connect at Forrest Junction.

1,211.2 MWCapacity
ActiveStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project E0016 — Gas in Calumet, Wisconsin
Queue IDE0016
Statusactive
Source statusactive
MarketMISO
TechnologyGas
Capacity1,211.2 MW
StateWisconsin
CountyCalumet
Point of interconnectionForrest Junction
Requested (queue) date2025-08-06
Proposed in-service date2027-12-01
Operational date
Withdrawn date
DeveloperInvenergy
Utility / transmission ownerWisconsin Electric Power Co

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata