MISO Queue Project E0017 — Battery in Lincoln, Missouri

MISO Queue Project E0017 — Battery in Lincoln, Missouri is a 257.9 MW battery interconnection project in Lincoln, Missouri with a current status of active. It is proposed to connect at Harley-Pike 161kV.

257.9 MWCapacity
ActiveStatus
MISOMarket
BatteryTechnology

Project facts

Canonical nameMISO Queue Project E0017 — Battery in Lincoln, Missouri
Queue IDE0017
Statusactive
Source statusactive
MarketMISO
TechnologyBattery
Capacity257.9 MW
StateMissouri
CountyLincoln
Point of interconnectionHarley-Pike 161kV
Requested (queue) date2025-08-06
Proposed in-service date2028-08-06
Operational date
Withdrawn date
DeveloperUnion Electric Company d/b/a Ameren Missouri
Utility / transmission ownerAmeren Missouri

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.