Missionary 230kV Substation (J1020)

Missionary 230kV Substation is a 250.0 MW solar interconnection project in Jasper County, Mississippi with a current status of withdrawn. It is proposed to connect at Missionary 230kV Substation.

250.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMissionary 230kV Substation
Queue IDJ1020
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity250.0 MW
StateMississippi
CountyJasper County
Point of interconnectionMissionary 230kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2022-09-01
Operational date2022-09-01
Withdrawn date2020-01-24
Developer
Utility / transmission ownerCOOPERATIVE ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata