Mississippi Power 25-IC-1355 (25-IC-1355)
Mississippi Power 25-IC-1355 is a 165.0 MW solar interconnection project in Jasper County, Mississippi with a current status of active. It is proposed to connect at Jasper East - Enterprise 230 kV Line.
165.0 MWCapacity
ActiveStatus
MSMarket
SolarTechnology
Project facts
| Canonical name | Mississippi Power 25-IC-1355 |
|---|---|
| Queue ID | 25-IC-1355 |
| Status | active |
| Source status | GIA Executed; NTP Pending |
| Market | MS |
| Technology | Solar |
| Capacity | 165.0 MW |
| State | Mississippi |
| County | Jasper County |
| Point of interconnection | Jasper East - Enterprise 230 kV Line |
| Requested (queue) date | 2025-04-16 |
| Proposed in-service date | 2029-07-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Mississippi Power Co |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata