Mississippi Power 26-IC-1490 (26-IC-1490)

Mississippi Power 26-IC-1490 is a 199.4 MW gas interconnection project in Clarke County, Mississippi with a current status of active. It is proposed to connect at Laurel East - Sykes SS 230 kV Line.

199.4 MWCapacity
ActiveStatus
MSMarket
GasTechnology

Project facts

Canonical nameMississippi Power 26-IC-1490
Queue ID26-IC-1490
Statusactive
Source statusCluster Study
MarketMS
TechnologyGas
Capacity199.4 MW
StateMississippi
CountyClarke County
Point of interconnectionLaurel East - Sykes SS 230 kV Line
Requested (queue) date2026-04-03
Proposed in-service date2029-05-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata