Mississippi Power IC-012 (IC-012)

Mississippi Power IC-012 is a 640.0 MW gas interconnection project in Clarke County, Mississippi with a current status of withdrawn. It is proposed to connect at Meridian NE - Laurel East line.

640.0 MWCapacity
WithdrawnStatus
MSMarket
GasTechnology

Project facts

Canonical nameMississippi Power IC-012
Queue IDIC-012
Statuswithdrawn
Source status
MarketMS
TechnologyGas
Capacity640.0 MW
StateMississippi
CountyClarke County
Point of interconnectionMeridian NE - Laurel East line
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata