Mississippi Power IC-062 (IC-062)

Mississippi Power IC-062 is a 630.0 MW gas interconnection project in Jackson County, Mississippi with a current status of withdrawn. It is proposed to connect at Daniel 500 kV Switchyard.

630.0 MWCapacity
WithdrawnStatus
MSMarket
GasTechnology

Project facts

Canonical nameMississippi Power IC-062
Queue IDIC-062
Statuswithdrawn
Source status
MarketMS
TechnologyGas
Capacity630.0 MW
StateMississippi
CountyJackson County
Point of interconnectionDaniel 500 kV Switchyard
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2002-02-25
Developer
Utility / transmission ownerMississippi Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.