Mississippi Power IC-1023 (IC-1023)

Mississippi Power IC-1023 is a 49.6 MW solar interconnection project in Forrest County, Mississippi with a current status of active. It is proposed to connect at Hattiesburg Southwest – Plant Eaton 115 kV Line.

49.6 MWCapacity
ActiveStatus
MSMarket
SolarTechnology

Project facts

Canonical nameMississippi Power IC-1023
Queue IDIC-1023
Statusactive
Source statusGIA with NTP
MarketMS
TechnologySolar
Capacity49.6 MW
StateMississippi
CountyForrest County
Point of interconnectionHattiesburg Southwest – Plant Eaton 115 kV Line
Requested (queue) date2022-02-23
Proposed in-service date2022-11-17
Operational date
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata